A co-educational, multi-denominational, post-primary school that opened in September 2020, named after Ériu, who gave her name to Ireland, Éireann/Éire in Irish.

Ériu Community College is under the patronage of Dublin and Dún Laoghaire Education and Training Board (DDLETB).


PROJECT DURATION

11 WEEKS

A standalone, 2-storey, low carbon in-operation expansion project that delivered a BCAR-compliant specialist classroom block, with a Building Energy Rating (BER) of A, and an air tightness test less than 1m³ /hr/m².

Mac Zero constructs 1600m² modular classroom block for Ériu Community College

PROJECT INFO

Ériu Community College in Blanchardstown, Dublin is benefitting from an additional 1,600 sqm modular classroom block consisting of 52 modular units.

The nearly zero-energy building (nZeb) consists of ten classrooms, a Home Economics room, SEN facilities, an internal lift, WCs and UAWCs.

Delivering a sustainable building for the future, this highly insulated and airtight modular building has already achieved a 'best in class' BER A rating, which will contribute to efficiencies within the school's future running costs.

The 1600 sqm classroom block was manufactured offsite, with the project taking just 11 weeks from start to completion. Onsite time was reduced and the install took place during the summer months to minimise disruption to the school community.

M+E PROJECT SPECIFICATIONS

Heating - Plumbing, ventilation and installation of a Split Air Conditioning Heating and cooling system. Room controls have been installed with ease of use in mind.

Plumbing - Boosted cold water is provided to all cold water outlets throughout the building with non-concussive taps to all wash hand basins within the toilet areas. Hot water is provided by efficient point-of-use water heaters.

Extract ventilation - S&P extract fans are controlled by presence detectors.

LPG GAS provided to the science rooms complete with automatic gas controls in the science classroom and prep rooms.

Efficient LED light fittings throughout with programmable PIR presence detection sensors.

3 Phase Supply to specialist machinery in construction and engineering rooms.

CCTV cameras throughout building, connected to school's security system.