MULLINGAR COMMUNITY COLLEGE / EDUCATION

Millmount Rd, Mullingar, Co. Westmeath

A co-educational, multicultural and student-centred post-primary school


PROJECT DURATION

5 MONTHS

An 845sqm, standalone 2-storey, low carbon in-operation expansion project that delivered a BCAR-compliant specialist classroom block, with a Building Energy Rating (BER) of A.

Mac Zero constructs 845m² standalone 2-storey classroom block for Mullingar Community College.

PROJECT INFO

Mullingar Community College, part of Longford and Westmeath Education and Training Board, is a co-educational, multicultural and student-centred post-primary school delivering educational excellence within Mullingar and the wider community.

In March 2022, the college received the green light for an extensive modular build project. In just five months, Mac Zero manufactured and delivered the sustainable building, which has expanded the college’s footprint, and includes four new general classrooms, two class-based SEN units, the principal’s office and staff room.

The much-needed investment in the college’s facilities will make a significant difference to the school community, with the standalone classroom block delivering more space for the growing college.

The 845sqm block is split over two floors, the ground floor of the new building provides two SEN classrooms, a central activities area and ancillary rooms, and on the first floor, there are a further four general classrooms.

M+E PROJECT SPECIFICATIONS

Heating - plumbing, ventilation and installation of a VRF Air Conditioning, Heating and Cooling system. Room controls have been installed with ease of use in mind.

Plumbing - Boosted cold water is provided to all cold water outlets throughout the building with non-concussive taps to all wash hand basins within the toilet areas. Hot water is provided by efficient point-of-use water heaters, and accessible showers have been installed along with height-adjustable sinks.

Efficient LED light fittings throughout, with programmable PIR presence detection sensors.

Call alarm system throughout the building.

SITEWORKS

The new modular accommodation was sited adjacent to the existing school building. The existing entrances to the school site were widened and a turning circle and drop-off zone created to allow safe student drop-off to the new SEN modular building. This involved resurfacing, additional drainage provisions and line marking including pedestrian crossing between the existing school and the modular building.

The building was installed to provide level-access for ease of access and avoiding ramps and steps. Canopies were also installed to provide cover at the entrances.

Due to constraints within the existing school drainage infrastructure, a new foul pumping chamber with emergency storage capacity was installed to serve the new modular building.

Please enter your email below to download Mac Zero’s Mullingar Community College Case Study

Previous
Previous

ERRIGAL COLLEGE PHASE 2

Next
Next

GAELSCOIL RUAIRÍ